Hanstholm Harbour

Project: Hanstholm Harbour
Customer: Hanstholm Havn
Time of execution: 2015
Description of the project: Cleaning out 56.000 m³- 1.600 m³/day transported via truck
   

In connection with the ongoing maintenance works of the water depths in Hanstholm Harbour, we carried out several cleaning operations of the surrounding basins of the harbour. The materials were slightly polluted, and therefore not environmentally safe to deposit at sea on a dock. Instead, they had to be deposited in a land fill, approximately two km from the harbour. This was carried out by several trucks that were loaded by an excavator in the quay. It ended up to be 56.000 m³ or 89.600 ton. With 30 ton per truck it took 3000 round trips!